|
|
Cebu International Port
 Berthing Facilities
- 495 meters of berthing space
- -8.5 meters controlling draught at MLLW
Cargo-handling Facilities
- 2 units 35-tonner ship-to-shore gantry quay cranes
- 1 unit 42-tonner ship-to-shore gantry quay crane
- 10 units 35-tonner rubber-tyred gantry cranes (transtainers)
- 15 units forklifts of 3 to 24-tonner capacity
- 1 unit 42-tonner reach stacker
- 36 reefer slots
- 24 units prime movers
- 26 units trailers / chassis
- 100 cu.m. elevated water tank
- 2 x 300 cu.m. ground reservoir
- 1,250 KVA generator set ensuring uninterrupted power supply
- 2,015 TEU ground slots
- Productivity: 30 to 32 containers per hour per crane
Storage Facilities
Block Alpha : 4-high stacking > 482,000 TEUs
Block Bravo : 4-high stacking > 532,000 TEUs
Domestic Zone
 Berthing Facilities
- 3.8 kilometer berthing space
- 3 finger piers for additional berthing space
- 6.5 meters draft at MLLW
Storage Facilities
- Open Storage Area of approximately 300,000 sq.m.
Passenger Terminals
- Passenger Terminal 1 at Pier 1
- Passenger Terminal 2 at Pier 3
- Passenger Terminal 3 at Berth 13
- Ferry Terminal at Pier 3
(with counterpart ferry terminal at Muelle Osmena in Mactan)
Cargo-related Facilities
- 5 accredited cargo-handling service providers can provide cargo-handling needs with efficient facilities
- Ro-Ro ramps at Pier 1 and Berths 11-12
|